{"id":2130,"date":"2026-11-20T10:39:49","date_gmt":"2026-11-20T10:39:49","guid":{"rendered":"https:\/\/energyguyana.gy\/?p=2130"},"modified":"2026-11-20T10:56:02","modified_gmt":"2026-11-20T10:56:02","slug":"sbm-offshore-awarded-contracts-for-the-longtail-fpso-in-guyana","status":"publish","type":"post","link":"https:\/\/energyguyana.gy\/index.php\/2026\/11\/20\/sbm-offshore-awarded-contracts-for-the-longtail-fpso-in-guyana\/","title":{"rendered":"SBM Offshore awarded contracts for the Longtail FPSO in Guyana"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">SBM Offshore announced that it was awarded contracts by ExxonMobil Guyana Limited (EMGL), an affiliate of ExxonMobil Holdings Corporation, for &nbsp;Guyana\u2019s eighth offshore petroleum development, the Longtail.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The company said that under the contract, it will construct and install a Floating Production, Storage and Offloading vessel (FPSO) which it will operate for an initial period of 10 years.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Ministry of Natural Resources on November 12<a href=\"https:\/\/energyguyana.gy\/index.php\/2026\/11\/14\/government-approves-longtail-petroleum-production-licence\/\" data-type=\"link\" data-id=\"https:\/\/energyguyana.gy\/index.php\/2026\/11\/14\/government-approves-longtail-petroleum-production-licence\/\" target=\"_blank\" rel=\"noopener\"> announced the approval<\/a> of the Longtail Project. This involves the approval of the Longtail Field Development Plan and the issuance of the corresponding Petroleum Production Licence (PPL).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project will be operated by ExxonMobil Guyana Ltd. Alongside its coventurers, Hess Guyana Exploration Ltd. And CNOOC Petroleum Guyana Ltd.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Longtail Project will be developed as a multi-field gas and condensate project targeting nine reservoirs located in the Stabroek Block.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The FPSO design is based on SBM Offshore\u2019s Fast4Ward program, incorporating the Company\u2019s tenth new-build multi-purpose floater hull. The FPSO will be designed to produce and process 1.2 billion standard cubic feet of gas per day and 250,000 barrels of condensate per day.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The FPSO will be spread moored in a water depth of about 1,750 meters and will be able to store around 2 million barrels of condensate.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">SBM Offshore said it plans to work with more Guyanese companies, source fabrication work locally, and hire Guyanese engineers for its FPSO project and operations teams. The company cited its experience with <em>Liza Destiny<\/em>, <em>Liza Unity<\/em>, <em>Prosperity<\/em>, <em>ONE GUYANA<\/em> and <em>Jaguar<\/em>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>SBM Offshore announced that it was awarded contracts by ExxonMobil Guyana Limited (EMGL), an affiliate of ExxonMobil Holdings Corporation, for &nbsp;Guyana\u2019s eighth offshore petroleum development, the Longtail. The company said that under the contract, it will construct and install a Floating Production, Storage and Offloading vessel (FPSO) which it will operate for an initial period [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":2131,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"iawp_total_views":2,"footnotes":""},"categories":[2,15],"tags":[],"class_list":["post-2130","post","type-post","status-publish","format-standard","has-post-thumbnail","category-featured","category-offshore"],"_links":{"self":[{"href":"https:\/\/energyguyana.gy\/index.php\/wp-json\/wp\/v2\/posts\/2130","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/energyguyana.gy\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/energyguyana.gy\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/energyguyana.gy\/index.php\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/energyguyana.gy\/index.php\/wp-json\/wp\/v2\/comments?post=2130"}],"version-history":[{"count":2,"href":"https:\/\/energyguyana.gy\/index.php\/wp-json\/wp\/v2\/posts\/2130\/revisions"}],"predecessor-version":[{"id":2133,"href":"https:\/\/energyguyana.gy\/index.php\/wp-json\/wp\/v2\/posts\/2130\/revisions\/2133"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/energyguyana.gy\/index.php\/wp-json\/wp\/v2\/media\/2131"}],"wp:attachment":[{"href":"https:\/\/energyguyana.gy\/index.php\/wp-json\/wp\/v2\/media?parent=2130"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/energyguyana.gy\/index.php\/wp-json\/wp\/v2\/categories?post=2130"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/energyguyana.gy\/index.php\/wp-json\/wp\/v2\/tags?post=2130"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}