{"id":2093,"date":"2026-11-14T13:21:11","date_gmt":"2026-11-14T13:21:11","guid":{"rendered":"https:\/\/energyguyana.gy\/?p=2093"},"modified":"2026-11-14T13:21:12","modified_gmt":"2026-11-14T13:21:12","slug":"government-approves-longtail-petroleum-production-licence","status":"publish","type":"post","link":"https:\/\/energyguyana.gy\/index.php\/2026\/11\/14\/government-approves-longtail-petroleum-production-licence\/","title":{"rendered":"Government approves Longtail Petroleum Production Licence"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong> T<\/strong>he Ministry of Natural Resources on November 12 announced the approval of Guyana&#8217;s eighth offshore petroleum development, the Longtail Project. This involves the approval of the Longtail Field Development Plan (FDP), along with the issuance of its corresponding Petroleum Production Licence (PPL).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project will be operated by ExxonMobil Guyana Ltd. Alongside its coventurers, Hess Guyana Exploration Ltd. And CNOOC Petroleum Guyana Ltd.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">According to a press release from the Minister, the Longtail Project will be developed as a multi-field gas and condensate project targeting nine reservoirs located in the Stabroek Block.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">According to the release, the Longtail development will be Guyana\u2019s first Non-Associated Gas (NAG) project, making it a significant milestone in the country&#8217;s petroleum sector and an important step towards the development and commercialization of its natural gas<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"alignleft size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/energyguyana.gy\/wp-content\/uploads\/2026\/11\/Longtail-Pic-1024x768.jpeg\" alt=\"\" class=\"wp-image-2095\" style=\"width:516px;height:auto\" srcset=\"https:\/\/energyguyana.gy\/wp-content\/uploads\/2026\/11\/Longtail-Pic-1024x768.jpeg 1024w, https:\/\/energyguyana.gy\/wp-content\/uploads\/2026\/11\/Longtail-Pic-300x225.jpeg 300w, https:\/\/energyguyana.gy\/wp-content\/uploads\/2026\/11\/Longtail-Pic-768x576.jpeg 768w, https:\/\/energyguyana.gy\/wp-content\/uploads\/2026\/11\/Longtail-Pic-1536x1152.jpeg 1536w, https:\/\/energyguyana.gy\/wp-content\/uploads\/2026\/11\/Longtail-Pic-80x60.jpeg 80w, https:\/\/energyguyana.gy\/wp-content\/uploads\/2026\/11\/Longtail-Pic-324x243.jpeg 324w, https:\/\/energyguyana.gy\/wp-content\/uploads\/2026\/11\/Longtail-Pic-200x150.jpeg 200w, https:\/\/energyguyana.gy\/wp-content\/uploads\/2026\/11\/Longtail-Pic-480x360.jpeg 480w, https:\/\/energyguyana.gy\/wp-content\/uploads\/2026\/11\/Longtail-Pic-696x522.jpeg 696w, https:\/\/energyguyana.gy\/wp-content\/uploads\/2026\/11\/Longtail-Pic-1068x801.jpeg 1068w, https:\/\/energyguyana.gy\/wp-content\/uploads\/2026\/11\/Longtail-Pic.jpeg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Anand Gohil, Interim President of CNOOC Petroleum Guyana Limited; Alistair Routledge, President of ExxonMobil Guyana; Vickram Bharrat, Guyana\u2019s Minister of Natural Resources; and Alan Pitts, Director of Hess Guyana Exploration Limited, following the approval of the Longtail development.<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">The development will utilize a new-build Floating Production, Storage and Offloading (FPSO) vessel, with a gas handling capacity of approximately 1.2 billion cubic feet per day (Bcfd) and a condensate production capacity of up to 250,000 barrels per day.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The development is expected to produce approximately 776 million barrels of condensate over a 30-year production period. Production will be facilitated through 27 production wells and 18 gas injection wells, with first production anticipated before the end of 2030. The development will incorporate full gas reinjection capabilities, as well as gas export facilities to accommodate gas utilization and development onshore.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Ministry said that the Longtail PPL builds on the firm foundation set by previous licences while incorporating provisions that reflect the distinct characteristics and opportunities of the Longtail gas development. Like these earlier licences, it includes measures to improve reservoir management, strengthen production monitoring and promote operational efficiency. It further introduces a few notable provisions tailored for the development of Longtail as a NAG project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">These provisions include requirements for a gas utilisation and export study which assesses reservoir performance, production forecasting, gas export timelines and gas marketing opportunities. It also features the requirement for risk and safety management systems in relation to gas export to be in place along with provisions to ensure that the FPSO has the required gas export facilities included in the facility\u2019s base design.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">These are in place to ensure plans are streamlined and the facility is prepared for eventual gas export. These measures reflect the Government&#8217;s continued efforts to enhance resource management and ensure the efficient development of the country&#8217;s petroleum resources.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">According to the release, the Longtail development will also mark an important step towards realizing President Ali\u2019s plans for a natural gas industrial site in Berbice, as outlined at the Berbice Development Summit. These plans include a second offshore Gas-to-Energy pipeline, which is expected to facilitate increased gas supply for power generation and support the establishment of new industries, including fertilizer production, alumina and mineral processing, data centres and other energy-intensive activities in the region.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Ministry of Natural Resources on November 12 announced the approval of Guyana&#8217;s eighth offshore petroleum development, the Longtail Project. This involves the approval of the Longtail Field Development Plan (FDP), along with the issuance of its corresponding Petroleum Production Licence (PPL). The project will be operated by ExxonMobil Guyana Ltd. Alongside its coventurers, Hess [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":2094,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"iawp_total_views":7,"footnotes":""},"categories":[2,15],"tags":[],"class_list":["post-2093","post","type-post","status-publish","format-standard","has-post-thumbnail","category-featured","category-offshore"],"_links":{"self":[{"href":"https:\/\/energyguyana.gy\/index.php\/wp-json\/wp\/v2\/posts\/2093","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/energyguyana.gy\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/energyguyana.gy\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/energyguyana.gy\/index.php\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/energyguyana.gy\/index.php\/wp-json\/wp\/v2\/comments?post=2093"}],"version-history":[{"count":2,"href":"https:\/\/energyguyana.gy\/index.php\/wp-json\/wp\/v2\/posts\/2093\/revisions"}],"predecessor-version":[{"id":2097,"href":"https:\/\/energyguyana.gy\/index.php\/wp-json\/wp\/v2\/posts\/2093\/revisions\/2097"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/energyguyana.gy\/index.php\/wp-json\/wp\/v2\/media\/2094"}],"wp:attachment":[{"href":"https:\/\/energyguyana.gy\/index.php\/wp-json\/wp\/v2\/media?parent=2093"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/energyguyana.gy\/index.php\/wp-json\/wp\/v2\/categories?post=2093"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/energyguyana.gy\/index.php\/wp-json\/wp\/v2\/tags?post=2093"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}